Pike St Crossing to be Closed on July 24 for Asphalt Prep

The Pike St crossing will be closed on July 24 for asphalt prep work.

 

The contractor is preparing to pour asphalt along the first phase, and will be able to shift traffic over afterwards.

 

Sidewalks are continued to be poured on the south side of East Washington St.