Sanitary Sewer Installation Near Complete & Curb on South Side of Washington

The installation of the sanitary sewer is almost nearly complete.  The pictures below show the last manhole being installed.  One small section of sewer still needs installed after some work on a water line.

 

Beaty’s curb and sidewalk crews have shifted to the south side of East Washington St.